Making history in LA

Sian
Friday 28 Feb 2014

PBI-funded courthouse in Long Beach takes home Commercial Real Estate Award


In November 2013, an official dedication ceremony was held for the first civic building in the US to be completed through performance-based infrastructure (PBI). The Governor George Deukmejian Courthouse in Long Beach, LA cost $495m to complete and was designed by AECOM (architect/engineer of record), Clark Design Build / Edgemoor Development (design-builder) and Johnson Controls (facility manager).

“We’re proud to have played a role in creating this building that serves one community and offers a promising model for so many others,” said Bill Hanway, AECOM’s executive vice president for Buildings Places, Americas. “This is performance-based design for performance-based infrastructure, which required a uniquely collaborative process and dynamic perspective. The result is a building for the court, for the community, for today, and for tomorrow.”

Under the PBI agreement, the state pays nothing until the building is occupied. Upon occupation the state has full ownership of building and site and pays back on an annual basis the project's capital costs as well as annual operating and maintenance expenses over 35 years. Deductions can be made if the facility fails to meet certain performance criteria. Expansion room for six additional courtrooms will be leased to Los Angeles County for the next 15 years, with the State benefiting from the revenue and the private sector carrying full responsibility unless or until the State chooses to occupy it.

The 531,000 sq ft facility replaces an outdated courthouse dating back to 1959 which was rendered insufficient for modern capacity and seismically unsafe. The new Governor George Deukmejian Courthouse was opened in September 2013 and completed under budget and ahead of schedule. It includes 31 courtrooms with the potential for 6 more in a future expansion, court administrative space, detention facilities, offices of related county justice agencies and retail space. The development also includes the renovation of a nearby parking structure for use of visitors to the courthouse.

In order to ensure that the building was capable of withstanding the heavy footfall of a courthouse, the team has selected finishes that are hard-wearing but easy to maintain. These include terrazzo flooring instead of carpeting, ipe wood planks for the roof soffits and long-lasting LED lighting fixtures.

A courtyard is at the centre of public circulation routes with daylighting provided where possible. All courtrooms and the majority of public spaces use variable air volume displacement ventilation, supplying the air at floor level to provide a comfort level where building users are rather than using excess energy to cool the entire room.

The project has already won a host of awards, the latest being the Commercial Real Estate Award for 2014 Best Public Project.

Credits

Owner/client: State of California Judicial Council, Administrative Office of the Courts
Developer: Long Beach Judicial Partners/Meridiam Infrastructure
Design-builder: Clark Design Build/Edgemoor Development
Architect/engineer of record: AECOM
Facility manager: Johnson Controls

Want to submit your project to World Architecture News?

Contact The Team
Jobs
  • Town Planning Manager | Housebuilder in Surrey | 3+ years' PQE

    Are you a Town Planner with some commercial experience under your belt (consultancy or developer)? Would you like to work for a regional housebuild...
    • Lewis Davey
    • Surrey - near M25/M23 junction
  • Principal Planning Consultant (Policy)

    This is a career opportunity for somebody looking to play a key role in the delivery of an effective and efficient planning policy service.
    • Capita
    • Manchester/Salford (North West) or Breckland or North Tyneside or Barnet (North London)
  • Planning Officers

    Work as key members of the Councils development management service providing pre-application advice, dealing with applications and appeals.
    • Chiltern and South Bucks Council
    • Amersham, Buckinghamshire
  • Enforcement Officer - Hertfordshire

    A Local Authority in Hertfordshire are looking for an Enforcement Officer to assist them with a backlog of cases for an initial contract of 3-6 months
    • Oyster Partnership
    • Hertfordshire
  • Planning Officer

    Do you want to work for a Planning Authority in a superb world-class location, that also has an outstanding record of achievement?
    • Plymouth City Council
    • Plymouth, Devon