Healthy Design Healthy Place

SUNDAY 19 NOVEMBER 2017

SEARCH   
 
Previous Next
 

AISD Performing Arts Center, Austin, United States

Monday 10 Aug 2015
 

Austin’s energy efficient arts facility

 
AISD Performing Arts Center by Miró Rivera Architects & Pfluger Associates Architects in Austin, United States
Thomas McConnell LLC 
 
AISD Performing Arts Center by Miró Rivera Architects & Pfluger Associates Architects in Austin, United States AISD Performing Arts Center by Miró Rivera Architects & Pfluger Associates Architects in Austin, United States AISD Performing Arts Center by Miró Rivera Architects & Pfluger Associates Architects in Austin, United States AISD Performing Arts Center by Miró Rivera Architects & Pfluger Associates Architects in Austin, United States AISD Performing Arts Center by Miró Rivera Architects & Pfluger Associates Architects in Austin, United States AISD Performing Arts Center by Miró Rivera Architects & Pfluger Associates Architects in Austin, United States
Your comments on this project

No. of Comments: 2

Add comments | More comments

07/09/15 Thomas McConnell, Austin, Texas
photography by Thomas McConnell LLC
13/08/15 Jessica M, Austin
In the end the project received a 5 star rating from Austin Green Building Program!
 

A new performing arts centre has transformed a former airport site into a vibrant, pedestrian-oriented community in central Austin 

The AISD Performing Arts Center (PAC) is the first district-wide Fine Arts facility in the 134-year history of the Austin Independent School District. Approved via special bond election, the state-of-the-art venue was completed on time and below budget (under $350/sq ft), and serves more than 84,000 K-12 students at 129 schools. Instead of a sprawling suburban site, the PAC is located on the grounds of a former airport that is being transformed into a vibrant, pedestrian-oriented community in the heart of Austin, the second fastest-growing city in the United States.

A landscaped plaza and amphitheatre are open to the public, while a ribbon-like aluminium and steel trellis wraps around two sides of the building, converging at a dramatic, cantilevered porch that defines the main entrance. Glass and translucent panels bring in light during the day, and create the effect of a glowing lantern during evening performances.

Clad in maple and walnut, the main auditorium seats 1,200 people on two levels. Mechanised acoustic drapes allow the space to be tuned to the needs of any performance — from a full orchestra to a solo vocalist — at the touch of a button. In addition to the main auditorium, the facility contains a 250-seat black box theatre; 4,690 sq ft dance studio; 2,600 sq ft multipurpose room; kiln room; and individual recording studio.

The project anticipates a LEED Gold certification as well as a 4-star rating from Austin Energy Green Building. A 60 kW rooftop solar array will offset up to 8% of the building’s annual energy needs, while day lit offices and public spaces reduce energy use. When compared to a baseline case study, the PAC achieves the following: 23% less overall energy use; 100% less irrigation potable water use (via greywater recycling); and 33% less indoor potable water use. 44% of building materials were sourced within 500 miles, and the building contains 33% recycled content.

WAN Awards

Key Facts

Client
Status
Value (m€)
Miró Rivera Architects & Pfluger Associates Architects
 
ECOWAN
 

Click here to view the NEWS IN PICTURES tablet site