WAN Awards 2017

SATURDAY 24 JUNE 2017

SEARCH   
 
Previous Next
 

Sultan Mizan Zainal Abidin Stadium, Malaysia, Malaysia

Thursday 16 Jul 2009
 

Close call..

 
Sultan Mizan Zainal Abidin Stadium by WAN Editorial in Malaysia, Malaysia
 
 
Sultan Mizan Zainal Abidin Stadium by WAN Editorial in Malaysia, Malaysia Sultan Mizan Zainal Abidin Stadium by WAN Editorial in Malaysia, Malaysia Sultan Mizan Zainal Abidin Stadium by WAN Editorial in Malaysia, Malaysia Sultan Mizan Zainal Abidin Stadium by WAN Editorial in Malaysia, Malaysia Sultan Mizan Zainal Abidin Stadium by WAN Editorial in Malaysia, Malaysia
Your comments on this project

No. of Comments: 0

Add comments | More comments

Be the first to comment
 
Editorial

Stadium collapses with no loss of life days before major event 

These dramatic pictures show the extent of last month's collapse of a major sporting venue in Malaysia.

The stadium, only just a year old, was scheduled to host the Public Institutions of Higher Learning games which would have seen thousands of competitors and spectators packed in the year-old sports arena. Although no lives were lost, the collapsed roof has left numerous red faces in the state. Calling it an embarrassment that had tarnished the country's image, Works Minister Datuk Shaziman Abu Mansor lashed out at contractors for not building a proper structure. Shaziman said the ministry would investigate the cause of the collapse and an in-house consultant would evaluate the damage. A car and three motorcycles parked outside the stadium were damaged when about 80 metres of the roof collapsed about 9.30am. Most of the debris crashed onto the grandstand of the RM292 million ringgit stadium.

The stadium had apparently been issued a temporary certificate of fitness by the Public Works Department just before the Malaysian Games last May, although none was required for a government building. He also estimated damage at RM25 million, adding that a Korean contractor was appointed to construct the roofing structure. "We don't have the details of why and how it happened but we will wait until the investigations are over," he said, adding that the stadium would be closed until repairs were completed. He also said the stadium was still under the main contractors', Bina Struktur Sdn Bhd, Emarcon Sdn Bhd and Genggam Mercu, two-year warranty.

Key Facts

Status
Value 0(m€)
WAN Editorial
worldarchitecturenews.com

More projects by this architect

UK high-rise checks

British Homes Awards 2017

Grenfell Tower fire

Grenfell House fire

Northern Arc

More Projects

 
WAN Business Information
ECOWAN
 

Click here to view the NEWS IN PICTURES tablet site