SEARCH IN BRIEF

 
Race Cottam Associates submit plans for advanced green energy facility

Plans have been submitted for a groundbreaking energy from waste plant in London, designed by Yorkshire architects Race Cottam Associates. The advanced gasification facility at Dagenham Dock forms part of the London Sustainable Industries Park.

Sheffield-based team Race Cottam were appointed by Resource Park developer Cyclamax to design the plant, which will use advanced conversion technology on commercial and non-recyclable waste from businesses in the area. Heat and power is produced by the gasification process to take residual waste materials from local businesses and convert them to a gas – called a syngas – that can be used in the same way as natural gas.

Race Cottam has worked with London Thames Gateway Development Corporation and the Mayor of London’s office to deliver the designs and architectural advice for the project. Regional Director David Speddings said: “The facility will provide heat and power from East London’s commercial waste – diverting it from landfill sites – and will allow other tenants on the Park to use renewable and low carbon heat and power for their offices, workshops and factories.”

If planning permission is granted, it is hoped construction of the flagship facility on a 3.5ha Brownfield site will be completed by the end of 2012. Race Cottam, which has been working closely with Stratus Environmental on the project, has a growing portfolio of major waste and energy schemes across the UK. These include the provision of architectural design services for the £250m Belvedere scheme to deliver what is set to be the largest waste treatment facility ever built in Britain.

IN BRIEF
Tuesday 23 March 2010
St George welcomes NAWIC to Battersea Reach
Fri 23 Jan 2015
Architecture for Humanity files for bankruptcy
Wed 21 Jan 2015
Rogers Stirk Harbour + Partners announced their new office, releasing the film ’The Leadenhall Building’
Wed 21 Jan 2015
HOK Completes acquisition of 360 Architecture
Thu 15 Jan 2015
Broadway Malyan celebrates first built project in the Americas
Thu 15 Jan 2015
Mersin Integrated Health Campus reaches financial close
Wed 14 Jan 2015
In 2014, 97 buildings of 200 meters’ height or greater were completed – a new record
Wed 14 Jan 2015
SimpsonHaugh and Partners announce new LLP partners
Tue 13 Jan 2015