THONET

TUESDAY 21 OCTOBER 2014

SEARCH   
 
 
WAN Mobile
 
WAN Mobile
Previous Next
 
Shenzhen Bao’an International Airport - Terminal 3, Guangdong, China 
Thursday 28 Nov 2013
 
New airport design to be copyrighted? 
 
Images: Studio Fuksas 
 
Your comments on this project

No. of Comments: 0

Add comments | More comments

Be the first to comment
 

Editorial

Shenzhen Airport Group so thrilled with design of Terminal 3 (opening today) they are taking steps to copyright the concept 

Today (28 November 2013) is the first operational day of Terminal 3 at Shenzhen Bao’an International Airport in Guangdong. Designed by Studio Fuksas with BIAD and Knippers Helbig Advanced Engineering, the 500,000 sq m volume increases the capacity of the airport by 58% and enables the facility to handle up to 45 million passengers each year.

Based on the concept of a manta ray, the airport centres on a 1.5km-long volume with numerous projections, all wrapped in a double skin with honeycomb motif. This design was such a success with the client (Shenzhen Airport Group Co.) that investigations are underway into copyrighting the concept to prevent any replica developments.

The 1.5km-long roof spans 80m with metal and glass panels in a honeycomb shape. This arrangement allows vast quantities of light to filter through the roof system, illuminating the interior volume and glinting off the stainless steel finishes within.

Knippers Helbig was responsible for the development of structural solutions for the reinforced concrete of the arrival and departure levels as well as for the static analysis of the steel structures of the roof and facade. Here, the diamond-shaped structure refers directly to the honeycomb shape of the facade and is stiffened additionally by cross members.

The spring-loaded bearing bolts of the steel structure permit uniform distribution of temperature and especially seismic loads on the supports, creating a unified impression of the structural elements up to 400 m long.

For Studio Fuksas, the overarching themes were ‘movement’ and ‘pause’, as the team considered walking distances, wayfinding, processing times, visibility of amenities and potential crowding issues. A forest of white ‘trees’ can be found within the interior volume and act as air conditioning vents to provide comfortable conditions for all travellers.

Studio Fuksas is also involved in two further stages of expansion at Shenzhen Bao’an International Airport, due to complete in 2025 and 2035.

Credit list

Project Shenzhen Bao’an International Airport
Client Shenzhen Airport Group Co. Ltd.
Developer Shenzhen Airport Group Co. Ltd.
Architect Massimiliano und Doriana Fuksas, Rom
Architect of Record BIAD (Beijing Institute of Architectural Design)
Structures / Facade / Parametric design Knippers Helbig Advanced Engineering Stuttgart - New York
Structural design Thorsten Helbig, Florian Kamp, Fabian Friz, Dominik Honerboom, Li Amin
Facade design Florian Scheible, Roman Schieber, Milos Dimcic, Werner Roll
General Contractor China State Construction Engineering Corporation, CN-Beijing
Lighting Consulting Speirs & Major Associates, Edinburgh, London

Key Facts

Status Completed
Value 0(m€)
Add your name to this project
Studio Fuksas

More projects by this architect

Chengdu Tianfu Cultural and Performance Centre

 
Vola
ECOWAN
 

Click here to view the NEWS IN PICTURES tablet site