WAD 2014

WEDNESDAY 30 JULY 2014

SEARCH   
 
 
World Architecture Day 2014
 
World Architecture Day 2014
Previous Next
 
Dubai Metro, Dubai, United Arab Emirates 
Monday 17 Mar 2008
 
Metro train service - Dubai style 
 
 
 
Your comments on this project

No. of Comments: 1

Add comments | More comments

17/05/09 ABadawi, Doha
One of the amazing projects ever in all the middle East, Well Done
 

Work has begun on Dubai Metro 

Dubai's economy is generating a rapidly growing population and severe traffic congestion problems. The Population is forecast to reach some 3 million by 2017, with tourist numbers projected to reach 15 million by 2010. The need for a rail system to relieve growing motor traffic congestion and to supply additional transport capacity has been become self-evident.

Two lines are already under construction, the Red and Green Lines, and two more lines are under consideration, the Purple and Blue Lines.

The 52.1km Red Line will have 29 stations, four of which will be underground. It will run the length of Dubai from the Deira side of the Creek to Jebel Ali near the border with Abu Dhabi. It is planned that the first phase will open in 2009.

The 17.6km Green Line will have 14 stations - six underground and eight at ground level. It will run on both sides of the Creek serving the Deira and Bur Dubai central business districts. In these areas the stations will be underground. Two major underground interchange stations will have direct connections to the Red Line. The aim is to open in 2010, one year after the Red Line. Outside the central business districts, the trains will run on elevated viaducts through stations, for which the design and aesthetics have been developed specifically to enhance the urban architecture along its corridor. Taxi stations and park-and-ride facilities are planned for key Metro stations. The driverless, fully automated trains will be fully air-conditioned and designed to meet Dubai's specific requirements. The trains will offer standard class with a women and children only section plus a first class section. Five-car sets will provide seating for 400 passengers and standing room for many more. Groundworks began in February 2006, centred around the 52.1km Red Line. In August 2006 a second contract was awarded for building the 17.6km Green Line. Tunneling works for the Red Line were completed in January 2008. Shipments of rolling stock have already started arriving in Dubai for testing this year.

The 49km eight station line Purple Line will connect Dubai airport with Al Maktoum International Airport. The line is likely to be extended to new developments at later stages. Starting construction in March 2009, Purple Line services are scheduled to begin in December 2012. The Blue line, which will initially be 50km long also connecting Dubai International Airport to Al Maktoum International Airport, is currently under study. It is likely to be extended from Dubai airport to Palm Deira and to other new developments towards Dubai waterfront projects. Dubai RTA expects 318km of metro lines to be in operation by 2020. To reduce further the city's reliance upon road transport, the ٌRTA is also considering adding 268km of light rail lines that will serve as feeders to Dubai Metro.

Key Facts

Status Onsite
Value 0(m€)
Aedas
www.aedas.com

More projects by this architect

Xuhui Binjian Media City 188S-G-1 Tower

Olympia 66

2012 Industry Outlook

The Jewels of Riyadh

Boulevard Plaza

More Projects

Latest Jobs in Dubai

Design Director

Design Director

Senior Site Architect - Dubai

3D Visualizer

Conceptual Design Architect

Senior Architect

Senior Architect - Healthcare

Design Office Manager / Architectural Design Manager

Design Architects

Senior Architect / Designer

Concept Designer - Senior Level - Dubai

Architect

Senior Retail Mall Designer

Project Architect/Project Manager

Senior Master Planner

Project Architect - Dubai

Senior Healthcare Architect / Project Manager – Healthcare

Design Manager - Hospitality Projects

Lead Architects Dubai, UAE - Interviews in Sydney Early January

Senior Architect - Dubai

Interior Design Leader

Architectural Project Manager

Project / Senior Architect

Design Manager (Development Company)

 
Vola
ECOWAN