WAN AWARDS 2013

TUESDAY 21 MAY 2013

SEARCH   
 
 
LIVE TENDERS News Review World Architecture Day 2013 Jobs Award News
 
 
Previous Next
 
25kV, Rotterdam, Netherlands 
Wednesday 30 Jan 2008
 
High voltage offices
 
Photography courtesy of Luuk Kramer
 
Your comments on this project

No.of Comments: 0

 Add comments | More comments 

Be the first to comment

Mei architecten turn transformer building into modern office block

The introvert former transformer building has been turned into a transparent multi-occupant building. This was achieved by removing the long blank façade and replacing it with a steel frame filled with glass.
This new structure contains toilets, pantries, stairs, lift and circulation to and from the offices. Since daylight is admitted through this zone, the toilets and pantries are entirely made of glass, which is translucent for privacy reasons.
The voids in the service zone also function as air channels. In the summer period the slats at the top and bottom open. This allows the air in the offices to be refreshed. The corridor between the offices and service spaces such as the pantries has become a collective space where the occupants of the various offices can meet one another and forge new plans.

Key Facts

Status Complete
Value 0(m€)
Mei Architecten en stedenbouwers BV.
www.mei-arch.nl

More projects by this architect

St. Jobsveem


WAD 2013
ECOWAN