WAD 2014

FRIDAY 25 JULY 2014

SEARCH   
 
 
World Architecture Day 2014
 
World Architecture Day 2014
Previous Next
 
Flanders Business School Antwerpen, Antwerp, Belgium 
Tuesday 08 Nov 2011
 
Past becomes present 
 
All images: Thomas De Bruyne 
 
Your comments on this project

No. of Comments: 0

Add comments | More comments

Be the first to comment
 

BURO II & ARCHI+I completes contemporary project at historic listed building 


This recently completed project concerns two 19th century buildings on the corner of the Sint-Katelijnevest and the Korte Nieuwstraat. These buildings form a whole and are connected on each floor. They have been listed since 1981 yet were vacant and in a precarious condition.

Bordering the unique and historic 19th century Jesuit chapel, FBS wanted to build an entirely new infrastructure that met the most modern requirements of executive education, with an auditorium, cafeteria, conference accommodation, a coffee and business corner, office space, etc.

The preservation of the original vacant space and the historic outside walls form the conceptual basis together with the auditorium and its break rooms (five areas connected to the auditorium). The circulation from and to the auditorium becomes a substantial part of the architecture that externalises FBSs entrepreneurship. The break rooms engage with the original outside walls and the unique vacant space in the building, resulting in interesting fields of tension and perspectives.

The starting point of the design concept is the preservation of the uniqueness of the listed building: the original intermediate floors, historic vacant space, ventilation of the canals and the 19th century fa├žade.

Key Facts

Status Completed
Value 0(m€)
BURO II
www.buro2.be

More projects by this architect

Business Centre Wingene

Wellington Golf Residence

Mero Beach

Baiyun International Congress Centre

 
ECOWAN