WAN AWARDS 2013

TUESDAY 21 MAY 2013

SEARCH   
 
 
LIVE TENDERS News Review World Architecture Day 2013 Jobs Award News
 
 
Previous Next
 
Heathrow Terminal 5, London, United Kingdom 
Thursday 03 Jan 2008
 
Nearing completion at Terminal 5
 
Hayes Davidson & Roger Stirk Harbour + Partners
 
Your comments on this project

No.of Comments: 0

 Add comments | More comments 

Be the first to comment

Roger Stirk Harbour + Partners' Terminal 5 due to complete in March 2008

The construction of a fifth terminal at London Heathrow, seen as critical to the airport’s continuing position as the busiest in Europe, was the subject of a limited competition in 1989. The winning scheme is based on a projected capacity of 30 million passengers annually and reflects the success of ‘singlelevel’ airport terminals such as London Stansted, designed by Norman Foster for the British Airports Authority, also the client at Heathrow. The passenger areas at Terminal 5 are on one level, with plant rooms, baggage handling and other ancillary functions below, though passenger areas extend over two levels at both edges of the building. The immense roof is dynamically curved, with great bands of glazing flooding the interior with daylight and leading passengers through the building in a logical progression from arrival point to embarkation. The building is effectively a dramatic progression of spaces, which vary in height according to their function. The structure is strongly expressed, with great structural ‘trees’ supporting the roof. Aircraft load and unload at stands on the core building, as well as at two satellites served by a rapid-transit system. Provision is made for an underground and mainline rail link from central London, contained in deep tunnels. Natural ventilation is impractical in view of noise and air pollution from aircraft but the design adopts an energy-efficient strategy using a displacement air-conditioning system developed by Arup and shading by means of canopies and low eaves to reduce solar gain on the long east and west elevations. Heathrow Terminal 5 is likely to be one of the most striking examples of airport architecture at the beginning of the 21st century and as significant a work in the RSHP oeuvre as the Centre Pompidou in the 1970s and Lloyd’s of London in the 1980s. The new terminal is due to open at the end of March 2008.

Key Facts

Status To be completed March 2008
Value 0(m€)
Rogers Stirk Harbour + Partners
www.rsh-p.com

More projects by this architect

Las Arenas

Leadenhall Building

One Hyde Park

Barangaroo

British Museum Extension

More Projects


Latest Jobs in London

Part II Arch Assistants and Part IIIArchitects

Part II Architectural Assistant

Project Architects

Architectural Assistant/Visualiser

Copywriter and Communications Coordinator

Project Architect

Lead Project Architects

Assistant Facade Engineer

Architect

Architects and Architectural Assistants

Part I Architectural Assistant

Interior Designer (Technical)

Model Maker

Part II and III Architectural Assistant

Interior Designer

Architect

Middleweight Interior Designer

Part II Architectural Assistant

Middleweight Interior Designer

WAD 2013
ECOWAN