THONET

THURSDAY 30 OCTOBER 2014

SEARCH   
 
 
WAN Mobile
 
WAN Mobile
Previous Next
 
All Saints Primary School, Sydney, Australia 
Friday 29 Jan 2010
 
The kids go marching in... 
 
Photography copyright Brett Boardman 
 
Your comments on this project

No. of Comments: 0

Add comments | More comments

Be the first to comment
 

Award Entry

Candalepas Associates completes stage one of new Sysdney primary school 

The completion of the first stage in the All Saints Primary School campus in Belmore has achieved the first part of a long term goal of the Greek Orthodox Church to establish a cultural precinct around the existing All Saints Church. The fully completed campus will see further institutional and educational buildings and public domain works.

The building is a narrow extruded form; teaching spaces are located over four levels accessed from external timber screened walkways. The stepping walkway section which increases to up to 5.5m in width is designed to provide additional external teaching spaces and allows building occupants flexibility to respond to varying climatic conditions. Reflected daylight is bounced in to the plan by angled coloured fin blade walls on the eastern fa├žade, this moderates light levels and provides an individual character to each classroom, whilst also controlling solar gain.

The proportion and orientation of the building provides all spaces with dual aspect promoting cross ventilation, which in conjunction with exposed high thermal mass surfaces, solar control devices and ceiling fans provides a high degree of thermal comfort. The roof which runs the length of the site collects and recycles rain water.

It was agreed from an early stage that a school should be a lasting stable structure in repose and that it should stand largely against time though with the accumulation of a material patina. To this end the materials were selected and the construction was composed to achieve a robustness tempered by a material and chromatic warmth and with a poetic playfulness that was considered appropriate for such an institution. Stretching a penny with all of the project team, a school was made and it is the architects' hope that all who attend will be inspired by and recall fondly the experience over the next hundred years.

Key Facts

Status Completed (Stage 1)
Value 0(m€)
Add your name to this project
Candalepas Associates
www.candalepas.com.au

More projects by this architect

Candalepas Associates

Latest Jobs in Sydney

Rail Architects

 
Vola
ECOWAN
 

Click here to view the NEWS IN PICTURES tablet site