WAD 2014

WEDNESDAY 23 JULY 2014

SEARCH   
 
 
World Architecture Day 2014
 
World Architecture Day 2014
Previous Next
 
Schiecentrale 4B, Rotterdam, Netherlands 
Thursday 29 Oct 2009
 
Harbouring ideas for the future 
 
Mei architecten en stedenbouwers b.v. 
 
Your comments on this project

No. of Comments: 0

Add comments | More comments

Be the first to comment
 

Award Entry

A harbour building to live, work and relax in 

Schiecentrale Phase 4b is the final phase in the redevelopment of the former Schiehavencentrale and surroundings. Schiecentrale Phase 4b consists of a striking new structure built around the north-west sides of the old Schiecentrale building. The new complex provides the media centre with various types of dwellings, for people closely involved in the audio-visual sector and people in other creative disciplines who like the port atmosphere still palpable in the area.

The new structure consists of around 55,000 sq. m of space. Office space accounts for 7,000 sq. m of that. Also included are 156 living / working units and twenty ground-accessed quayside dwellings that are 3.5 floors in height. Additional facilities include a supermarket (2000 square metres), a gym (600 square metres), 400 parking spaces in a supervised garage, and a semi-public deck 3000 square metres in area.

A main feature of the project is the tall narrow building, 130 metres long and 50 metres tall, built on top of the old power plant. The 11-floor structure contains the offices and living-working units. These are accessed from a gallery finished in stainless steel. Attached to the gallery are storage spaces, which are situated directly opposite the front doors.

All spaces on the west side of the building are fitted with glazed façades. This part of the building offers a wonderful view of the Nieuwe Maas and the harbour. The partitions of the living/working units can be opened from floor to ceiling with harmonica doors, allowing the creation of an exterior space within the building volume.

On account of the great flexibility, all technical installations in the spaces as well as on the façades are carried out as assembly. The complex exudes the character of a typical port building in which technology from the offshore and processing sectors has been integrated.

Key Facts

Status Completed
Value 0(m€)
Mei Architecten en stedenbouwers b.v.
www.mei-arch.nl

More projects by this architect

Fabriek Delfshaven

Latest Jobs in Rotterdam

Experienced Revit Architect/Manager – Rotterdam

 
ECOWAN