WAN AWARDS 2013

THURSDAY 23 MAY 2013

SEARCH   
 
 
LIVE TENDERS News Review World Architecture Day 2013 Jobs Award News
 
 
Previous Next
 
Unilever House, 100 Victoria Embankment, London, United Kingdom 
Wednesday 18 Jul 2007
 
The transformation of Unilever House
 
Photography: H.G. Esch
 
Your comments on this project

No.of Comments: 1

 Add comments | More comments 

17/11/08 D.J. STONE, LEWES
Having spent more than 35 years working in Unilever House and experienced several makeovers, I still respected the air of paternalism,warmth and tradition warmth that existed maintaining a link to the evolution of the Company. I am sorry to say that again the designers have been left to revel in flights of fancy .It will make a fitting annex to the TATE MODERN !
Click for more ...

KPF transforms Unilever House at 100 Victoria Embankment in London

Completed in 1931 as Unilever’s headquarters and Grade II listed in 1977, the scope of KPF’s work included re-developing the 1930's structure and a portion of a 1970's extension to the north. Unilever wanted to be able to remain in the building and within the City of London but had operational requirements for a more modern flexible workplace than that provided by the building, which also had significant functional deficiencies. Following an extensive consultation process with Unilever, the City of London and English Heritage, KPF developed proposals which achieved a balance between retaining the important parts of the building’s historic fabric and providing a transformed work place and spatial experience for the many visitors to the building. The floor plates are reconfigured within a spatially interesting atrium, creating a stronger sense of interconnection. Staff and meeting facilities are located at the top of the building, above which is a roof garden. On the ground floor, a café, exhibition space, restaurant and conference area restore the public nature of the building. The fit-out achieves the spirit of openness seen in the 1930's building archive. The transformed Unilever House offers Unilever a new lease of life within their historic home, safeguards the active future of a listed building and brings the building up to British Council for Offices (BCO) specification throughout. The project achieved a BREEAM "excellent" rating and carbon emissions were reduced by 25 percent (far greater than regulations currently require).

Key Facts

Status Completed
Value 0(m€)
Kohn Pedersen Fox Associates
www.kpf.com

More projects by this architect

Hudson Yards

W.R. Berkley Corporation HQ

Midfield Terminal Building, Abu Dhabi International Airport

Palace 66

Abu Dhabi International Airport Midfield Complex

More Projects


Jobs available with Kohn Pedersen Fox Associates

BIM Support Specialist

Latest Jobs in London

Part II Arch Assistants and Part IIIArchitects

Part II Architectural Assistant

Project Architects

Architectural Assistant/Visualiser

Copywriter and Communications Coordinator

Project Architect

Lead Project Architects

Assistant Facade Engineer

Architect

Architects and Architectural Assistants

Part I Architectural Assistant

Interior Designer (Technical)

Model Maker

Part II and III Architectural Assistant

Interior Designer

Architect

Middleweight Interior Designer

Part II Architectural Assistant

Middleweight Interior Designer

WAD 2013
ECOWAN