WAD 2014

WEDNESDAY 17 SEPTEMBER 2014

SEARCH   
 
 
World Architecture Day 2014
 
World Architecture Day 2014
Previous Next
 
Canterbury School Aquatics Center, Milford, United States 
Wednesday 08 Jul 2009
 
Canterbury acquire Aquatics Center 
 
Woodruff/Brown Photography for the new BRB-designed AQUATIC Center. 
 
Your comments on this project

No. of Comments: 0

Add comments | More comments

Be the first to comment
 

Build of Butler Rogers Baskett design completes 

Butler Rogers Baskett Architects (BRB) has designed a new aquatic center for the Canterbury School, a college preparatory, coeducational boarding and day school for students in grades 9-12, in Milford, Connecticut.

The Williams W. Higgins ‘53 Aquatic Center is comprised of an 8-lane, 25 yard pool for competitive swimming, diving and water polo; seating for 200 spectators; Canterbury team rooms; visiting locker rooms; and an Aquatic Director’s office.

A critical BRB design objective was to relate the new facility to the stone buildings of the core campus. The adjacent old Gymnasium, built in 1924, was designed by Raphael Hume in the English Collegiate Gothic style. The pool incorporates Roxbury granite (obtained from the same quarry that supplied the Old Gym); slate roofs with copper gutters and leaders, and limestone trim details that are faithful to the older structure.

One enters an upper-level mezzanine that overlooks the pool and connects to the main floor of the adjacent Alumni Gym. One level below, the new Pool and “wet” lockers are connected with the support facilities and “dry” lockers of the Alumni Gym, thereby facilitating overall operations and maintenance.

Key Facts

Status Complete
Value 0(m€)
Butler Rogers Baskett
www.brb.com

More projects by this architect

Molloy College

Trinity Chapel

 
Vola
ECOWAN
 

Click here to view the NEWS IN PICTURES tablet site