WAD 2014

THURSDAY 21 AUGUST 2014

SEARCH   
 
 
World Architecture Day 2014
 
World Architecture Day 2014
Previous Next
 
Great Ormond Street, London, United Kingdom 
Wednesday 25 Mar 2009
 
Great green hospital build commences 
 
 
 
Your comments on this project

No. of Comments: 0

Add comments | More comments

Be the first to comment
 

UK's 'greenest' hospital wing breaks ground at Great Ormond Street 

Construction has begun on the first phase of the new, £300m Mittal Children’s Medical Centre at Great Ormond Street Hospital for Children NHS Trust (GOSH), which is on target to become the UK’s ‘greenest’ medical building to date.

The scheme, designed by UK-based architectural practice Llewelyn Davies Yeang (LDY), is estimated to offset in excess of 20,000 tonnes of CO² annually - the equivalent to the typical yearly carbon footprint of around 2,000 people living in the UK. These figures are based on the scheme’s NEAT assessment, the health sector equivalent of BREEAM accreditation, in which the scheme has achieved an overall ‘Excellent’ Rating. This is a major step forward to achieving GOSH’s targets of a 120 per cent carbon reduction and 60+ per cent renewable energy contribution by 2016, when Phase 2 of the project is due to complete.

The new design for the Mittal Children’s Medical Centre will comprise of two linked buildings totalling more than 30,000 sq m, to be constructed over 2 phases, including the Morgan Stanley Clinical Building and the radical reconstruction and refurbishment of the old Cardiac wing.

The glazed facade of the new building maximises the amount of daylight to the building’s interior whilst minimising the solar gain internally. This greater level of transparency contributes to creating a comfortable environment that welcomes patients, visitors and staff whilst also forming a healing environment that aids patient recovery. As well as natural ventilation and lighting, the green design utilises natural paints and linoleum, and low VOC (Volatile Organic Compounds) materials have been selected in the vast majority of the interior finishes.

Dr. Ken Yeang, Design Director at LDY said: “We have designed the building in line with the client’s desire for a deep green sustainable development. The scheme’s estimated BREEAM figures are impressive in setting a new benchmark for sustainable design in the healthcare sector.”

Hear Ken Yeang talk to WAN about this groundbreaking project here.

Key Facts

Status Onsite
Value 0(m€)
Llewelyn Davies Yeang
www.ldavies.com

More projects by this architect

Great Ormond Street Hospital for Children Redevelopment

Genome Research Building

Ecological corridor

Latest Jobs in London

Qualified Architects.

Senior Interior Designer

Senior Project Architect - Studio Manager

Marketing and Submissions Coordinator

 
Vola
ECOWAN