WAD 2014

WEDNESDAY 23 JULY 2014

SEARCH   
 
 
World Architecture Day 2014
 
World Architecture Day 2014
Previous Next
 
Tate Modern extension, London, United Kingdom 
Friday 18 Jul 2008
 
Tate Modern extension redesigned 
 
© Hayes Davidson 
 
Your comments on this project

No. of Comments: 0

Add comments | More comments

Be the first to comment
 

Editorial

Herzog & de Meuron's design swaps glass for brick 

In an unusual turn for today's architecture Herzog & de Meuron have swapped the glass of their 2006 Tate Modern extension design for bricks in their 2008 redesign. The redesign follows a revised brief after consultation with artists and curators. At the heart of the updated plans are the unique oil tanks of the former power station which will be retained as raw spaces for art and from which the new building will rise. The new brick exterior will blend with the existing exterior of the former power station.

The original design featured glass blocks that towered to form an obscure pyramid but these blocks are eradicated from the recently unveiled redesign and replaced by a perforated brick pyramidal structure comprising the tankers at the base of the structure.The revisions have been shaped by a desire to integrate the new building both with the existing building and the local environment. The oil tanks lead directly into the Turbine Hall and these interconnecting spaces will become the foundation of the new Tate Modern.

The revised building will also set new benchmarks for museums and galleries in the UK for both sustainability and energy use. By exploiting heat emitted from EDFE's relocated transformers and employing passive design principles wherever practicable the scheme will use 40% less energy, and 35% less carbon than building regulations demand.

The redevelopment has been funded to date with £50 million from Government, £7 million from the London Development Agency and £13 million from the private sector towards the overall costs. New planning permission will need to be sought but provided this is achieved the project is due for completion in 2012.

Niki May Young
News Editor

Key Facts

Status art gallery tate modern
Value 0(m€)
Herzog & de Meuron
www.herzogdemeuron.com

More projects by this architect

Helvetia Head Office / Vancouver Art Gallery

M+, West Kowloon Cultural District

Jade Signature

National Library of Israel

Stade de Bordeaux

Messe Basel

Parrish Art Museum

2012 Serpentine Pavilion

Serpentine Pavilion 2012

Elbphilharmonie

2012 Serpentine Pavilion

Mãe Luiza Gymnasium

Park Avenue Armory

Elbphilharmonie

Porta Volta Fondazione Feltrinelli

Miami Art Museum

Elbphilarmonie

Parrish Art Museum

Tate Modern 2

BBVA Headquarters

Le Projet Triangle

56 Leonard Street

11 11 Lincoln road

Latest Jobs in London

Senior Interior Designer

Senior Project Architect - Studio Manager

Marketing and Submissions Coordinator

 
ECOWAN