SEARCH IN BRIEF

 
Yalu River Highway Bridge project won by CCCC Second Harbor Engineering Co. Ltd

CCCC Second Harbor Engineering Co. Ltd. has won the construction project of a 1,266m long highway bridge across the Yalu River which currently separates China from the Democratic People’s Republic of Korea (DPRK). The twin-pylon, double-plane cable-stayed bridge reaches 194.6m in height and has a main span of 636m with H-shaped bridge towers. Construction is due to take 19 months.

The engineering firm explains: “The bridge will become an important traffic intersection of the Europe and Asia land route channel and the Asia highway network when completed. It is of great significance in expanding the friendly cooperation between China and the Korean Peninsula and improving their bilateral technical and economic exchanges.”

IN BRIEF
Friday 18 May 2012
Biomimicry in Architecture 2nd edition
Fri 23 Sep 2016
2016 AIA|LA Presidential Honourees announced by American Institute of Architects Los Angeles Chapter
Mon 19 Sep 2016
Over 150 architects respond to Homerton College’s celebrating Homerton dining hall competition
Tue 13 Sep 2016
The Museum of Arts and Design in New York appoints Jorge Veneciano as new director
Wed 07 Sep 2016
WAN Awards Judge in the news
Tue 30 Aug 2016
Arup promotes John Karn to Principal
Tue 23 Aug 2016
London gets a new night tube service
Thu 18 Aug 2016
Finsbury Leisure Centre Design Competition: Winner announced
Tue 16 Aug 2016