SEARCH IN BRIEF

 
Yalu River Highway Bridge project won by CCCC Second Harbor Engineering Co. Ltd

CCCC Second Harbor Engineering Co. Ltd. has won the construction project of a 1,266m long highway bridge across the Yalu River which currently separates China from the Democratic People’s Republic of Korea (DPRK). The twin-pylon, double-plane cable-stayed bridge reaches 194.6m in height and has a main span of 636m with H-shaped bridge towers. Construction is due to take 19 months.

The engineering firm explains: “The bridge will become an important traffic intersection of the Europe and Asia land route channel and the Asia highway network when completed. It is of great significance in expanding the friendly cooperation between China and the Korean Peninsula and improving their bilateral technical and economic exchanges.”

IN BRIEF
Friday 18 May 2012
Oakland A’s hire four firms to lead new ballpark design process
Fri 17 Nov 2017
Architect Jane Greenwood is Honored as an “OUT 100”
Fri 10 Nov 2017
Darling Associates furthers growth momentum with a raft of new projects
Fri 03 Nov 2017
Zaha Hadid Architects, Arcplus and Wilson Associates announce strategic alliance
Fri 03 Nov 2017
AIA|LA Announces 2017 AIA|LA Design Award, Next LA, and COTE Winners!
Thu 02 Nov 2017
David Chipperfield to create master plan for Mia
Fri 27 Oct 2017
Diamond Schmitt Architects names new principals and associates
Mon 23 Oct 2017
Applied Studio gets a fresh look from Ragged Edge
Tue 19 Sep 2017